Showing posts with label Projects. Show all posts
Showing posts with label Projects. Show all posts

Friday, January 5, 2018

Steampunk PC Build - The Webcam, pt. 1

As previously mentioned, I'm building a PC. I've been thinking about it for a long while, especially since I acquired cast iron school desk and sewing machine frames, along with a somewhat beat up oak sewing machine top. Then, I received a few boxes of miscellaneous old electronics parts from my grandfather, which seemed to clinch the decision.

Strangely enough, I started with the webcam. I had most of the parts laying around the garage and studio, so I started assembly one Saturday afternoon....

My inspirations were various antique cameras I've seen in museums and online, coupled with a far-fetched steampunk backstory (more on that some other time). Since I had a decent amount of leftover molding from my old kitchen (prior to our remodel), I thought I'd put it to use. I also had a brass candlestick and some miscellaneous parts, so I gathered them together to see if the "feel" was right. As it turned out, the look and feel was what I wanted.

It was time to start cutting and dry-fitting

and a little more dry-fitting

Things were coming together, so I started the glue-up

Looking good so far, so I picked up a webcam off of eBay. I also added a peephole from a door and some dryer venting in lieu of a rectangular-folded, black canvas-covered paper "bellows" between the lens and "photographic plate". I know how to fold one, but felt I'd go a slightly different direction for visual impact. That's also part of the yet-to-be-told backstory for this piece of retro-future gear.

The webcam arrived, so rough assembly needed to happen. That turned out to be trickier to incorporate than I initially thought, as the USB connector demanded some stubbornly large holes to be made throughout the candlestick pieces.

There's more to this branch of the build to be covered in part 2, but after some brainstorming, that will be a few more Amazon purchases away. Note the beginnings of the mouse build in the right-hand portion of this photo. I'll have to learn how to weld brass to keep that branch of the build going.

More to follow!

Thursday, January 4, 2018

What's up?

Sorry. Okay, not sorry.

As I said in my previous post, I'm busy and don't always want to jump on a computer for fun after a day spent at a computer for work. However, I've been on vacation and got an itch to post a couple things. What about, you might ask? Well, here's a narrative excerpt of current goings-on.

The family and I just got back from a couple days "away" in Pasadena:


To some people's dismay, perhaps, we did not visit the Huntington Library  (again) this trip, though the thought had crossed my mind a few times. Seriously, it was only a couple of miles away at any given moment. But, alas, not everyone enjoys a handful of hours spent wandering slack-jawed and glossy-eyed while staring at old books and incunabula. (Steven, the lodging offer still stands so we can do that!)

At home, I've got other things consuming my attention. Namely:

  • The day job at Stone Brewing.
  • The holidays, now nearly all packed back up and returned to the attic.
  • My new PC build. It's a beast, for computing power, size, and the custom case I've decided to build. I've promised myself I will spend the time to disguise this technical monstrosity behind a veil of 1850-1950 tech. We'll see if I pull it off. I'll post more here... probably later today or tomorrow, to start the "build log" properly. Even this blog entry was spent testing out an ergo keyboard that I may or may not use for the new PC.
  • Tuning tools in the woodshop. This was not expected, but as I cut a few pieces of wood for the PC cabinet (above) on the compound miter saw, I discovered that "45°" plus another "45°" did not equal 90°. Sometimes more, sometimes less, depending on miter position. Infuriating, as the wood was cut. The Shopsmith is only a few feet away, but I know it needs a general tune up as well. So, before I saw (or resaw) any more wood, I need to spend a few hours realigning blades, fences, and tables, waxing tables and fences, and checking dust collection and air filtration.
  • Miscellaneous household repairs. It seems every room in the house has developed--either during the holidays or the preceding months--some sort of issue needing attention. Even the studio needs a few things (well, the studio bathroom sink has been missing for over a year). Some fixes are due to wear and tear, others are changes after living with the remodel for a while, others were on our wish list.
  • The "bi-weekly" Rogue Dragons Adventuring Company D&D game set in the Forgotten Realms... using Pathfinder/D&D 3.x thank you very much. :) Ooo... tomorrow night is game night!
  • A new Forgotten Realms campaign gifted to my son and (soon to be step-) nephew for Christmas. Like some of my previous campaigns, it started with a couple of props, a crumbling map, and an interesting backstory. I'm actually getting excited about this, as the two (so far) kids don't know FR or this version of D&D. There's an air of amazement and mystery already, and we haven't even sat down for character creation. I'll have to post that separately, too.
  • A couple of minor health things. Hopefully. I'll know more over the next week.
  • Another construction project. ::sigh:: The exterior of the garage and studio has some significant damage from weather, dry rot, and termites. This, unfortunately, will also take a bunch of time and money that we didn't plan on spending at this time. :(
  • Landscaping the patch of dirt we call a backyard. It's a mess, though it used to be beautiful, green, and inviting only a handful of years ago.
  • ...and, if there's time and/or money, we have some bookcases and shelves needing to be designed and built for the family room, library, and studio. Since I'm busy, I need to finalize SketchUp drawings for them so a furniture maker up the street can turn them into reality. Otherwise they stay on my persistent and ever growing project list, awaiting their moment at the top.
Happy New Year, everyone!

Thursday, April 23, 2015

Construction Projects

 
Life's gotten nothing but busier. Good thing the house is done... well, mostly. I suppose no house is truly done if you truly live in it. We're missing lots of little things and a few big things, like landscaping (as evidenced by the picture at the top of the page). I have a spreadsheet to track those odds and ends--things like "strip and repaint pantry doors", "hang artwork in gallery/loft", and "install cedar flooring in master closet"--so I know what to do next. Over 300 odds and ends when I first compiled the spreadshet. I've slowly been chipping away at that list, but I had a couple of other things to attend to prior to competing it. As if it will every be truly completed.

Since the weather was changing, such that it is in southern California, I had to address the growing quantity of beer in the cellar again. Essentially, my goal is to get all my beer* into either a refrigerator or a temperature controlled space so the various brews can age gracefully. However, cool winter weather was giving way to spring a little early, with temperatures already picking up above 80F in my town. This meant to me that I needed to insulate my beer. As some of you know, the cellar was originally "just" a converted closet, which after insulation, measures 7'h x 3'd x 2.5'w. Not bad for a start. Then my membership to the Reserve Society at The Bruery, as well as beer from work, started adding bottles faster than I was drinking them, so I built a second insulated space. This second space occupied a good portion of the garage until recently, measuring roughly 6'h x 5'w x 4'd and getting jammed full of wonderful bottled beers. This leads us to present day. I built a walk-in beer cellar. Yep, those are the pictures of it to the right.


Speaking of other things, I was feeling increasingly cramped while working up here in the studio. The floor space allocated to the cellar had taken a noticeable amount of space away from the already lacking free space. You know the sliding tile puzzles where you try to put the picture back together by moving individual tiles around countless times? That is how our life has been since October of 2012, and the last vestige of that problem was piled across the studio and mocking me every time I tried to do anything. So, I started looking around for ways to remedy the situation. It didn't take long, as my eyes almost immediately landed on the stack of surplus oak flooring left over from the house remodel that I intended to use the studio. Behold, the next project was before me. I needed to install the flooring to gain back a 5' x 10' space in the room. As of this writing, I'm nearly done. I have about 4' x 24' left before sanding and sealing.

That's enough right? Oh, but there's more! My brother, who's a huge Star Wars fan, asked me to help him build a Pre Vizsla costume. "Sure," I said, "that sounds fun and interesting." While we didn't finish the build by Star Wars Celebration last week, it's still moving along and will be ready for the next major Star Wars event (note the newly installed hardwood he's standing on).

That's not even counting all the stuff going on at work!


* while I say "all my beer" in the link, the inventory reflected on CellarHQ is actually out of date and in need of updating by a couple hundred bottles.

Thursday, February 7, 2013

Remodel - February 7

Just a quick update to let everyone see the progress on the remodel. As of this morning, the remodel currently looks like this if you're standing at the base of the studio steps:

Obviously I haven't been keeping this blog up to date, but I hope to backfill the missing period either via photos or another quick video.

Sunday, January 6, 2013

Remodel - Time Lapse v.1

 
After I'd been shooting photos of the construction for a while, I realized I could have been making a time lapse video. I went back and looked through the photos I took and found I had been relatively consistent in my camera angles. Thanks to some time spent in Photoshop, I was able to stitch the photos together and make them into something somewhat watchable with Windows Movie Maker. I hope you enjoy the quick video... and like it says, "More to come!"

Sunday, November 18, 2012

Remodel - Front Porch


October 9th

The front porch demolition started a bit after the back of the house. A few minor items had been removed up to this date, but the west window (which serves as a weather-break) was removed for storage. Behind the framing was another post that matches the one on the east. This was a great find and will most likely be restored and returned to its original place on the porch. It will also probably serve as the basis of the pattern we will use for the other posts on the porch.

November 2nd

The roof of the porch was removed to reveal all of the original woodwork still intact! Also revealed was the "paint shadow" of the previous porch design. From my time spent researching our house and pouring through old photos, the brick design was probably porch #3 and the "paint shadow" suggests the design of porch #2. We're rolling the design further back to recreate something more like the original porch. This photo also captures the hexagonal asphalt shingles that were put on top of the bottom-most wooden shingles.

November 6th

The demolition team removed the brick pillars, cement wall and floor. Beneath the few inches of concrete of the floor was several cubic yards of decomposed granite. Not what we expected! The cement floor used to sit right against the wall (which isn't good) and we had presumed the cement was a thick slab that reached down to ground level. On one hand, thin concrete made disposal easy. On the other hand, dirt sitting in direct contact with wood is worse than cement is. Minor signs of rot and termite damage hinted at what might sit behind the siding.

November 13th

The DG was removed and stored for later use (perhaps a path to the backyard to the east). The remaining plants around the front of the house were scraped away to make working easier. With the big dumpster removed, we got our first view of the old "four square" Victorian without anything else attached to it. Wonderful! Lots of photos have been taken to document this state of the house.

November 14th

The beginnings of the new porch footings were excavated and dirt beside the existing wall was also lowered. The siding that was in contact with the cement and dirt was removed to reveal more damage than was expected. Good thing we opened this up! Several of the joists had rotted or been eaten away to nubs that would eventually fail. The original piers were also mostly gone, but had been filled in with cement block to reinforce the front wall. This area will be repaired and/or reinforced before we build the new porch.

November 17th

The footings were excavated to their final depth and... the tractor broke our sidewalk in several places. We were initially upset with this, but upon closer inspection, the sidewalk was probably put in around the same time as the porch. The pattern and trowel marks didn't match the surrounding sidewalk, so we will replace it with something closer to the old designs in front of our house.

Thursday, November 1, 2012

Remodel - Month 1

The remodel. This is the granddaddy of all projects here at home. Those of you who know my wife and I have heard of this coming... for well over a year in the "it's coming" sense, but even longer if you have spent any significant time around us. Since this project will take around eight months, I thought it would be cool to document the process to give others an idea of what's going on. Sure, if you ask us, we will tell you it's a bit chaotic right now, but consider this: we live in a Victorian farmhouse that was originally built in 1895 and then modified for the course of eighty-something years. Some things were added, others removed, and in the end, we thought the resulting exterior looked like a great old house with a bizarre late 1970-era tumor of a room addition growing off the back of it. We have always wanted to fix that particular aspect of the house and we are now getting our chance to address it.

October 3rd

The demolition started on the back of the house. This proved to be a solid nudge to my wife and I, as we weren't exactly ready to move out. Honestly though, when is a person really ready to have their house razed? In our case, it was not the best of timing. Both of our jobs had kicked into overdrive rather than starting into the Fall at their usual and predictable pace.

October 5th

A couple more days into the demolition and things are looking a bit... um... ragged. Yeah, "ragged" will work. Coming home to this set us all on edge. The roof was gone! Then again, what should one expect when a home demolition has gotten underway? (I think the roof was removed on the 4th and then the rest of the siding and the porch were removed on the 5th.) We started prepping the "studio" for habitation that weekend.

October 13th

Having a brief rest from the demolition around us, we were getting somewhat prepped--both physically and mentally--to move out of the house that weekend. My father-in-law came down Saturday and helped me move the major appliances into the temporary setup in the garage. Thanks Larry! If it wasn't for this jumpstart, things would have been really rough.
 
We spent our first night in the studio that Saturday. We were downsized from a 1552 sq. ft. house down to 528 sq. ft. and it was already proving to be a challenge. What do you bring with you? What do you pack up and "leave behind"? How do you reduce nearly twelve years of living (and the associated accumulated and inherited "stuff") down to a one-room studio apartment? This is going to be an adventure... or so people are telling me!
 
Early rains also contributed to the slowdown, but everyone else seemed to have something to take care of. Andie and I got/had to straighten out more of the living space in the studio and moving additional things in.
 

October 22nd

Another weekend had come and gone. We had been living in the studio for ten days now and things were getting better... micron by micron. Cooking was proving to be a challenge, as we are both used to a gas range and oven, plus a full array of appliances and accessories. Now we have a two-burner electric rangetop, a toaster oven, and a microwave! Then there's the next question: what food and drinks do you keep in the mini-fridge and what are you going to run downstairs to grab from the fridge in the garage? Who needs a StairMaster when you live like this?

October 23rd

The crew is making short work of the demolition while still doing what they can to preserve any reusable materials. I really like that our team has a goal of reusing what they can, donating anything that we don't (or can't) use, recycling what we can, and responsibly desposing of what is left. Another back door was installed further into the house the day before to add some security.
 

October 24th

Okay, it may not look like much has happened in this photo (and parts of the previous photo are showing around the edges--I'm assembling them into one file for a timelapse .gif later), but trust me when I say there is a lot of progress on this one. The team has continued removing the drywall, but they are also salvaging whatever insulation they can so it can be reused elsewhere. Keep in mind that we are working within Title 24 energy consumption regulations.
 

October 25th

A lot of the debris from the demolition has been cleared to the large "rollaway" dumpster and now the amount of demolition is becoming more evident. I thought "I always thought my house had good bones, but they are showing now!"
 

October 26th

Again, it doesn't look like much has happened, but there is a lot of stuff that needs to be removed when a house is demoed. In this case, there was some wainscotting lining the bathroom and the breakfast nook that we wanted to reuse, so it needed to be carefully removed. Then, there was a lot of drywall that still was hanging around waiting to be stripped off.
 

October 29th

Now the bones are really showing! If Monday was any sign of the coming day or two, there wasn't going to be much left of the "new" part of the house. Over the weekend we got a chance to take a look at the strangely patched-up openings in the wall. There were doors in the dining area and nearby bedroom, along with a heretofore unknown window in the dining area as well! Interesting. I took several photos. It was also great to discover that the previous construction projects our house suffered through spared the boxed eaves. This was a great discovery, as we are trying elements of the original house intact.
 

October 30th

Here is most of the team discussing the plans for the rest of the day. I dropped by to check on progress and got a peek into what happens when we're away. There's a bit of a mess, but this is a testament to what they do during the latter course of the day. The team also goes to extra efforts to clean up the day's demolition detritus! Thanks goes out to them and especially Richard, our project manager. Thanks guys!
Notice how there isn't much of the 1970s portion of the house remaining?
 

October 31st


Happy Halloween! I came home a little early to take care of some discussions with Richard and get set to go "Trick or Treating" with my family when I was greeted with this sight--a circa 1895 house reduced to its original rear perimeter. Amazing! I know it's a simple concept, but it's another thing to experience it. This is a big deal to us! Next, the team is heading to the front porch to demo that problem into oblivion. I'll post those photos soon.

 
 

 


Sunday, March 27, 2011

Steampunk Speaker Stands

One of the things I like to do in the studio is listen to music. I have created a space dedicated to listening to music while sitting comfortably in recliners. Prior to this weekend, I had the speakers perched on whatever I could find to coax the speakers to ear-level. "Whatever I could find" didn't always sit well with me.

However, in an effort to trim down the project list, I sought to create and complete something this weeked. I nearly achieved my goal... you'll see what I mean at the end.

I have the Onkyo 7.1 system wired up to various components, including my computer (on the other side of the old gray desk, destined to be refinished... yet another project on the list). I found this ordinary ladder shelf at Lowe's and repurposed it to be a stereo component shelf. I'll add an isolation box for my turntable after I have knocked out some of the projects in my list. I have seen various designs for stereo racks online, but I think this one works rather well. I was able to buy it for just over $100. Assembly and installation took about one hour. I still need to create some cable management to route component and speaker cables through, but that can be a quick task one of these nights. I will then add the additional DVD changer and cassette player to the rack. After all this, a question still remains: How do I get the sound into the room without resorting to speaker mounting that seems out of place with the steampunk motif I am nurturing and without sacrificing sound quality?.

I had a burst of inspiration: Why not use wrought iron stair ballisters as speaker mounts? I went to the metal supply company that happens to have a "sister" store in the front which specializes in ornate metalwork. The idea grew from there. I could get all the parts needed to mount speakers to a post and I found some other parts that triggered further ideas. What about using the spare white oak 4x6 posts I had? That could work.

So this weekend I decided to complete something. I took a couple 4x6s and cut them down to create seven blocks of roughly the same size.

I drilled 1/2" holes at a "strategic point" (hopefully somewhere close to the ideal balance point). If you have a drill press, I recommend using it as your holes will be at 90 degrees to the base.
Take a 1/2" chisel and mark the corners of the hole you need to mortise. I do happen to have a mortising jig, but the density of this oak made its use impractical. I removed the wood with a chisel, occassionally needing the help of a hammer.

Here's a photo of the additional parts I found while wandering the metal supply store. Wooden base, steel post with decorations, and finally the simple rod mounts (not yet hammered into place by a ball peen hammer and then glued.)
i drilled two holes to accept some 3 inch rods to strategicly hold the speaker on the post..

After assembling everything, here's what they look like. They are simple for now, but they don't sacrifice too much to get a good look. Now if I can only figure out what color I'm painting the iron and what kind of stain I want to use on the base. Maybe I will even find some acoustically transparent cloth to keep the Victorian flair going.

The Studio, pt 1

Above the garage we have this room I like to call "the studio". It's a space about 24ft wide by 22ft deep. I think it was listed as a "game room" when we bought the house. When a friend needed a place to stay after his divorce, it was known as “Josh’s place”. When my wife was pregnant with our son, it became known as "the junk room", the dumping ground for everything that was in the room formerly known as "our office" and now known as our "son's bedroom". During his toddler years, it was all but lost to us. I'd brave the dust and piles of random stuff to escape into a book or drink a beer and listen to music undisturbed. Slowly but surely I reclaimed the room, chipping away at the junk that was put up here (95% of it mine admittedly), donating some things, throwing away others, or simply finding a decent home for the rest. My wife surrendered her claim to the space and started calling it my "man cave" (she's getting her own office in our home impending remodel).


About five years ago, I started thinking over the space.

I am not one to have a "man cave" in the grunting, crotch-scratching, poker-playing, football-watching, beer-guzzling sense. That image actually bothers me. I needed something else… something that had the Victorian feel of the rest of the house, but allowed for technology in a complimentary sense… something that reflected my "jack of all trades" tinkering mindset… and something that looked like it had been here for 115 years… or more.

With that thought in mind, I recalled the feeling of awe I experienced when my wife and I were touring the various rooms of Hearst Castle. A few of the rooms, Hearst purchased in Europe, had them meticulously disassembled, and then reassembled them inside of a newly built room in his mansion. Most of his other rooms were “gathered together”… this is my definition, but essentially, what they all had in common was a feeling of age. Permanence. History. It was as if the rooms were built in the twelfth century and had been lived in ever since, it’s inhabitants gathering things on their travels and bringing them together in these rooms over generations. I felt I was walking into rooms that were a few hundred years old, not ones that were less than a hundred. There was something to be learned here.

I also had been introduced to the term "steampunk" by a friend of mine. Shawn said "What? You've never heard of 'steampunk'? Holy crap, Bryon!! You of all people I know should know what steampunk is! You are one and you don't know about it? Wow!" He was flummoxed. Shawn was one of a handful of people who had known me since childhood and he was completely right. I have been a steampunk my entire life and I didn’t even know it.

So I toured some more houses and museums, took and reviewed photos, searched online, and looked into this “steampunk” thing seeking a design for “the studio”. I did some sketches and gathered ideas together as photos and notes in my computer. I did a lot of this. Heck, I still am.

As some of you know, I was fortunate enough to come into some free lumber. Not a lot, mind you, but I stumbled upon enough weathered lumber to use in the studio and give it that sense of age and weight. There were several white oak 4x6s chunks around 2.5 feet long and three 2x6s at 5.5 feet long. There were also some large pieces of mahogany, 3x16 and 5.5 feet long inches long. I got lucky. To me, these were the components necessary to build my bar.

My grandfather gave me his 1960’s vintage Shopsmith about nine years ago to help me fabricate the parts necessary to maintain an old house. (Thanks, Grandpa!) This tool, above the others I have acquired, is invaluable.

My ideas started making the leap from my brain to paper and even into physical shape... but I wasn't content with simply buying things at the local hardware and furniture stores.

Hardly. I started building.

First, I tore out the closet and built a cellar (aka “cold box”). Then I installed beer faucets and started building a bar. Embarrassingly enough, that was about a year ago. I’ve tweaked some designs, cut some lumber, and re-tweaked some designs. Along the way, I have made a few strategic purchases at hardware stores and antique shops, getting this bit of hardware or that interesting piece of furniture, all the while taking reference photos when something “spoke to me”.

Now I find myself staring at a "meta-project", a project of projects: "The Studio". It has become a collection of projects that will not be complete until all of the sub-projects are they themselves complete. I have become more aware of my incomplete project workload recently, so this realization bugs me. I have added this new project to the nigh infinite list in an effort to start whittling away at it.

Hence, "The Studio pt 1" begins.

Thursday, June 17, 2010

Update Update

I don't know about you all, but some days it can really suck being busy. Too busy, that is, to really get out and participate in that thing called "life". I have been working some long-ish days lately and, by the time I get home, my brain is threatening to leak out of my ears as some over-used liquid (or a gel). By the time the weekend rolls around, I am more interested in spending time being with my family and friends or working on the backyard... more interested in that than updating the blog. Yes, it has suffered a bit. It seems that family and friends who are more distant have suffered a bit as well, so I felt it was due time to update the blog to include everyone in the happenings.

Work - Yes, my job has its rewards, but when too much work stacks up—for a myriad reasons—it can be a bit stressful, if not downright painful. I'm chugging through things, delegating tasks, outsourcing others, and have even identified a new position I need to fill. (The Muse says I must stop talking about work... so I will comply)

Family - My wife is done teaching for the year and is moving to a different (and I daresay more affluent) school. A good summer's rest has been well earned. Our son is transferring schools to now attend the same school my wife teaches at. This should save time for everyone! He is enjoying Taekwondo classes, now on his second colored belt.

Friends - Among the "guys" (which also happens to include the wives/fiancees/girlfriends) we have been drawn closer by the sudden death of Shawn. We don't yet know why, but hopefully that will come in due time. "Fenn", you're missed! Everyone else, please know you can share whatever is on your mind!

Projects - ACK!!! A list of what is perhaps the meat of this post—or merely an "index" of posts to come—here is what I'm doing as a bit of stress relief:
  • Fountain - The fountain is nearly complete, requiring some adjustments to the "return" pump gallons per minute as well as the float switch that serves as a safety to prevent the pump from emptying the fountain into the alley behind our property.
  • Backyard landscaping - Thanks to a lot of pent up stress in need of some form of release, as well as some much needed help from Sterling Landcare Co., the yard is getting closer to completion. The patio needs to be leveled with a final layer of decomposed granite before I can set the bluestone and bricks. Nearby, the vegetable and herb garden is several weeks old and starting to offer up its bounty (a bit), netting us strawberries, sweet basil, and French marjoram. Green bell peppers, eggplant, butternut squash, baking pumpkins (probably too many), leeks, zucchini, chamomile, spearmint, and pineapple mint are all still settling in. Other plants will be added as we complete the entire garden plot... it's probably about 20% built out. (I've even considered aquaponics to conjoin the fountain/fish pond and the garden... and then slapped myself for considering another complex backyard project)
  • Coldbox - Okay, so there's not a lot of progress here, but I keep considering a few tweaks here and there... better hinges, a furred out frame on the latch side, finish work on the hinge-side frame, a better cooling system (or at least a way to fully chill the kegs separate from the bottle cellar), vintage temperature guages, and quick disconnects for all the keg lines.
  • Bar - Now that the cabinetry is in, it's easier to see the shape. With a mini-refrigerator inside, plus a wine 'fridge and the cellar next to it, the beverage supply is handled. I need to complete what would normally be the drip tray system (but in my case is an assembly of copper piping and assorted fittings) to manage any stray drips and runoff. I also have to get a bunch of hardware from various sources... enough info on this to be it's own post... like several of these items
  • Tools - My 1960-vintage Shopsmith Mark V, the most important tool in my shop, broke about three months ago. I've been so damn busy that it took me until this week to order and receive the pieces I need to get it back up and running. I'm looking forward to fixing it on Saturday... after I spend the day at work cutting over to a new SQL cluster.
  • Beers - Sure, I've posted some tasting notes here and there, but I've been pretty lax about that. Sorry. Usually by the time I'm done drinking them, I don't feel like posting about them (or maybe just can't see myself focusing long enough on the weaving keyboard and shifting screen to actually complete it). I will do better on this. I've got more tools at my disposal now, so it should not be as difficult (or at least I'll have fewer excuses).
  • Music - I have been neglecting this area worse than most others. Sure, I love music, but I have so much that getting new music hasn't been a priority. However, I did find time to see a Beats Antique and The Mutaytor show at the Belly Up Tavern. I bought a couple of CDs while there and will have to share some of that—as well as other great music—through blip.fm now that I have an account. I also got Abney Park's "Aether Shanties" for Christmas (thanks Hon) to go with my nearly complete "Vault" collection of Abney Park tunes. Other stuff has been catching my ear now wand then.
  • House remodel planning(!) - yeah, me ("Iron Man") and my family are in the process of planning for a remodel. The house needs some repairs and there are certain things that we just simply don't like, so we're going to fix them. The "new" portion of the house will get a complete overhaul, becoming a two story structure that looks like it has always been part of the house... as opposed to the strange collision between an 1895 Victorian farmhouse that is being "violated" by a 1970's California ranch.
That should... wait... I forgot "Miscellaneous", normally the largest section! ::sheesh:: I could go on for a very long time, but I'll stick to the immediate future:
  • building my first steampunk computer keyboard. It's been sitting dormant for about four or five months, but I started tinkering with it in the late nights lately. I like the progress.
  • restoring my rolltop desk, while hiding a full computer in it, and modifying some monitors to look like they have been part of the workstation since the 1890s. I hope to add more surround speakers and enough gadgetry to make H. G. Wells' spirit grin.
  • building some steampunk speaker stands for the Sapphire and Onkyo surround speakers on my Onkyo 7.1 system. The prototype looks good so far, but needs some additional wood, brass, gilding, and finishwork to be complete. I may have to add an amp to get the "B" 5.1 speakers online too.
  • refinishing the old chess table that keeps getting thumped by my left elbow tonight
  • getting the Liberty & Company Thebes Stool professionally repaired, restored, and refinished (and completing my amateur reproduction, now that I have my Shopsmith parts)
  • determining if the inherited '60s/'70s era rocker is an early Maloof piece or not... either way, I like it.
  • rigging up the temporary home theater in the studio (so we can have TV and movie entertainment up there while the house is being remodeled)
  • building the faux beams and arches for the studio, incorporating the mid-twentieth century Marcus Designs statues I picked up at a local antique shop.
  • converting another oak whiskey barrel into the studio bathroom's sink pedestal (complete with new glass "bowl-style" sink.

    ...and the most important step...
  • converting the studio over to a temporary living space for the family while we remodel the house
::whew:: that should cover it. I'll post more info on each of these as another form of stress relief over the next several weeks/months.

Tuesday, April 6, 2010

Project: Cold Box, pt 2 & Bar, pt 1

It's been a while since I posted anything on the status of my projects. Since I have so many "irons in the fire" that one of my friends has started calling me "Iron Man", I'll share just one... well, maybe two... in a way: the "Cold Box" Project and the associated bar.

A lot has happened since I last posted anything about the cold box project. The exterior got some drywall, "mud", and preliminary decoration. I drilled a few holes in the insulated panels so I could route CO2 and beer lines through the wall and out of the barrel ends. Well, the gas is currently sitting behind the bar and will eventually end up inside the bar... or given a Victorian treatment and displayed proudly as part of the bar.
At present, those two faucets are pouring Arrogant Bastard Ale and Stone India Pale Ale. The parts list is currently:
  • Oak barrel - since the barrel was no longer liquid-tight, I got it free. With the ends cut off and glued up, they make nice ornaments for a bar.
  • Faucets - the brass finish faucets come from Micromatic, as do all the other pieces and parts behind the scenes.
  • Tap handles - the handles are just that... antique door handles with a threaded hole that just so happened to be the same thread as the handle mount. They were found in a box in my garage when we bought our house.
  • Kerosene lamps - they were a cheap $3.00 find at Goodwill.
  • "Tool holder" - really, it's a matchstick holder for a fireplace. Again, a cheap find at $1.00. I repurposed it for the bar to hold a bottle opener, a corkscrew, and a "sporkener" I picked up at Magic Hat brewing Co. on my last vacation.
  • Railroad lantern - This was a Christmas gift from my grandfather. It has been converted from kerosene to electricity, but it is still really cool. Thanks Grandpa!
The bar itself is currently made up of three unfinished oak base cabinets I picked up at Lowe's (reasonably priced). The bar top is currently two massive slabs of mahogany I salvaged from an old pallet. Yeah. An old pallet. From France. Circa 1945. The pieces that make up the bar surface are 65" x 15.5" x 3". The bar's "arm rest" is made of the other two sides of the ol' rectangular pallet. They're a bit smaller at 64" x 7" x 3". I've resawed them into the front and side cantilevered raised section of the bar. Interestingly enough, these smaller pieces have some significant wear and weathering that, when combined with small amounts of dryrot and insect damage, give the surface the appearance of many years of service in the bar. Perfect!

The front of the bar (the ugly back of the cabinets) is currently obscured by two cherry veneer covered desk ends. As things progress, they will be replaced by some salvaged oak 4" x 6" posts and 2" x 6" planks. The mahogany will be finished with oil and a light sealant. All the oak will probably get a stain to complement the mahogany... unless it looks better oiled and sealed too.

What you can't see in the photos above are the other details I have planned. As of this writing, I anticipate building a canopy over the bar to store glasses, show off some sort of stained glass, and provide the requisite moody task lighting (like the example at right). I haven't selected the posts quite yet, as they need to be stout.

Around the outer edge of the cantilevered section of the bar, a band of LED lighting will provide more accent lighting. I don't know if I will mount it inside of some polished brass or copper tubing, but I'm considering it.

Where the cantilevered area joins the rest of the bar top, I will install some brass strips I found on our property. I stumbled across two large pieces of brass; the biggest, at 44" x 1.75" x 3/16" (with a shorter brazed-on 'L' section) will allow me to put an edging to provide more visual interest. The second piece of brass is close to the first in dimensions, but was found buried in the backyard; a significant (though not impossible to remove) coating of corrosion leaves me wondering what I will end up doing with it.

More later as the work progresses. I'll share updates in "Project: Bar, pt 2".

Monday, November 2, 2009

NaNoWriMo, pt 1

My Fake Family History: Fictional People and Events that Shaped My Life

[Author's Note: this entry is first part of my National Novel Writing Month novel project in what I endeavor to be 50,000 words by month's end. The project, "My Fake Family History: Fictional People and Events that Shaped My Life", is truly a "Random Musing" where I am taking nuggets of factual events from my family's history and weaving them into fictional stories while exploring different writing styles. I may reveal to you, the reader, the truth now and then, but don't expect it all the time.]

~ 1 ~

A Steampunk's Time Machine

There I was, sitting in the studio over the garage the other evening, looking over the myriad of projects in their varying stages of completion, when my eyes lingered upon the roll-top desk that once sat in my grandfather's house. Why had my eyes picked that moment to stare at the desk? Why did they linger? Perhaps some deeper part of my consciousness desired to start yet another project? The rest of me shuddered at the thought; I'm busy enough at present for two or three people.

To slake the thirst of project beast within, I walked to the desk, seeking the thing that drew my attention and held it fast. The desk, its outer shell a once-varnished thing of oaken beauty, was now coated in what I remember—from a few different conversations about the desk—to be World War II surplus gray paint from the naval shipyards of 32nd Street.

My grandfather was the master recycler, “repurposer”, and “upcycler”, and this desk symbolizes those aspects of his manner and personality to me. Thinking back to conversations about the desk with my mother, she did not know from where it was purchased, nor did she quite remember when it entered her family. All she could recall was that the desk always seemed to sit in the garage-shop of her childhood house on Church Avenue, serving the role of cash register in her parents' businesses: first for her father's welding business and later her mother's toy shop. Sometime in its history, my grandfather repainted it with the gray paint he had obtained while welding ships' hulls in the shipyards, covering the oak surface in a dull coat.

No. The lure of another project wasn't what the inner me was reaching for. My eyes took a quick inventory of the many little things are scattered across its top: miniatures… Victorian corner-shelves I had yet to hang in the corner of some room in our house… (etc.) Not one of the nigh-countless curiosities in sight had held my interest like the room-breadth stare had. There was something else calling to me.

Taking a seat in the old wooden office chair, the contents of cubbies and slots passed under my visual scan without a second glance. I leaned back seeking a different perspective. Crossing my legs under the desk, to gain some comfort while maintaining the critical counterbalance to my deeply reclined posture, my foot bumped the center drawer.

“That’s it!” my awareness urged, “Open the drawer!”

I had nearly forgotten it was there. Reaching far back under the desktop, I found the bottom lip of the cash drawer with my fingertips, my knuckles brushing against the pulls of the alarm till’s finger lock mechanism. Oh yes, I had nearly forgotten about that mechanism too. Indeed. This is what was tugging at me.










Friday, August 21, 2009

Project: Fish Pond, pt 4

One of the things the pond needs is a respectable "spitter" to go over the PVC pipes sticking out of the back wall. I've seen countless Green Man sculptures over the years, many of which would be perfect for such a job. Of course, when I actually make the effort to find one out there on the web, I can't find many that look good, are worth the price, or are the right size for the job.

It took a while, but I found the web site of Walter S. Arnold (stonecarver.com) with a few Green Man faces and even gargoyles that could work. This guy is an amazing stone carver! Ultimately, Andie and I chose "Mirth", a Green Man, from his collection.

Of course, once we decided on "Mirth", we realized we probably couldn't get it shipped in time for it to arrive before the vacation we had planned. Then, as things play out, I got a bit busy and didn't order them for another week or so. I did finally place the order. There's a saying that is something like "you can't rush art", so I waited. Not long, but I was anxious to keep the project rolling along. The confirmation email came from Walter, where he answered my questions. A few days later, he sent another email letting me know that he had shipped our "Mirth" castings, thus starting the "where is the package" game with the freight carrier.

It took about a week, but "Mirth" arrived two nights ago, complete with signatures, certificates of authenticity, mounting holes, and drilled out mouths. The "antique white" color as a hopeful match to the light cement walls was a guess, but Walter said they should look fine. He was right. The size of the Green Man faces is slightly smaller than ideal, but all the other attributes more than make up for it. Wonderful. Now all I have to do is mount them on the wall and hook up the water lines to their mouths... but that's another post.

Sunday, August 16, 2009

Project: Cold Box

The other project I have going on right now is a "cold box"... or at least that's what we call them at work. It's really a large refrigerator built out of insulated panels.

Around noon on the Saturday before Memorial Day, I decided to have a beer in the studio. I grabbed a Stone IPA and kicked back in my favorite desk chair. While it wasn't extremely warm outside, it was definitely a bit too warm in the studio. Well, too warm for the ten cases of beer I have stored out in the open up there. My wife was busy, my son was more than occupied with his Legos, and I had nothing planned, so naturally a "project" started poking at me. I resisted the urge for as long as I could—perhaps a whole five or ten minutes elapsed before I buckled under the pressure—and then dove into the project with full force. I moved the makeshift bar, emptied the closet, and tore out the wall... then the ceiling. As I got down to the studs, I was amazed at the poor construction. hardly any ceiling structure, but four 2x4s on one side of the doorway!

"Mini-me" came up during the deconstruction and totally got into it, banging holes in the drywall and laughing maniacally... the same way he does when he plays a driving arcade game while crashig into everything. Perhaps we "parental units" should worry about that a bit.

Anyway, once I had the space cleared out, the first couple of insulated panels went up quickly. Then everything slowed down as I figured out how to fit the remaining pieces in place of the wall, ceiling, and cold box door. The most important "trick" I needed to remember was no metal outside of the box can come in contact with the metal inside the box. If it does happen, I will have a big condensation problem. On the off chance I still ended up with condensation, I put in a PVC underlayment and shower drain. I covered over the insulated panel wall with drywall... which makes it completely boring to look at in a photo, which is why there isn't one of that phase here.

After much delay (heh, go figure!), I finally got back to the project. I used some more of those insulated panels--the same kind that make up the walls--as doors. An online order supplied the wire racking. A trip to Home Depot netted me the much needed strap hinges, foam-in-a-can, box o' self-tapping screws, and ducting for the cooling system. Currently, my cooling system is a salvaged window-mount air conditioning unit, but hopefully some day I will be able to swap it out for a Breez-Aire (or similar) cellar cooling system. Everything but the cooling system got put together during the spare moments I found here and there. I decided to hang two doors instead of one because it was "easier" and I didn't have an insulated panel big enough to act as the "single door". As I thought out this hare-brained scheme a bit more, it actually works in my favor: the bottom door will be for the kegs and coldest beers I don't access that often, while the upper door will cover the beer archive and "in-the-clear" (and already represented in the archive) interesting beers I have. Andie suggested I sheath the door in some luan "doorskin" to make it match the door adjacent to it. That awesome suggestion will be incorporated as soon as I tweak the doors so the don't rub each other and split the black insulating tape on the seams.

Ultimately, I found a little more time this weekend to burrow through the insulated panel ceiling to insert the supply for the cooling system. The cooling system is happily humming away as it chills my beer archive to cellar temperatures and below. After transferring most of the beer out of the old "beer 'fridge" into the new "cold box" I realized that... um... okay, don't tell anyone this... no, really, I'd be a bit embarassed if this got out... I have too much beer. Okay, there, I said it. I've got a problem that I think can only be solved by an "Open Bar" kinda party. I have to figure out when it could... wait a second. Septoberfest. Heck yeah! This might be the answer to my "problem". Until then, I have to whittle down the cellar a bit... one 22oz bottle at a time.

When everything was all said and done, I wondered "how much beer can this thing hold?" After a quick count of all the stuff I found energy to put in there tonight, the total is currently three 5-gallon kegs, twenty cases of 22-ounce bottles (that's 12 x 20 22oz bottles equalling 240 bottles), and an uncounted quantity of 750ml "laid-down" bottles, loose 22oz bottles, and 12oz (or less) bottles that are either "drink now" or "don't touch 'cause I'm aging 'em" beers.

::sheesh:: I've got to free up some room for the wine that is supposed to go in here. This was, after all, supposed to house not only beer, but wine as well. Sure, the bar just on the other side of the wall will have a small fridge for white wines (and maybe a cold 6-pack if it'll fit), but this thing has to be able to hold some laid-down reds. Well, there's only one thing left to do...

So... when does Septober arrive again?